If you're interested in our products, kindly pls send us your e-mail address, more information will be sent to you!
Product Description
1. Original Lumileds SMD3030 chips , LM80 TM21 certified, Up to140lm/W
2. Meanwell driver, 5 years warranty
3. Power: 50w/100w/150w/200w/240w/300w
4. Equiv. to: 250W/250W-400W/600W/700W/1000W
5. Various beam angles optional: 30°*70°/60°*90°/120°
6. Function: Zigbee dimmable, DALI dimmable, motion sensor, daylight sensor optional
7. Materials: Die cast Aluminum / Tempered glass (PC lens optional)
8. Installation method: Loop & Hook hanging / Wall mount / Surface mount / Rack mount
9. Ideal mounting height: 8-15 m
10. Certification: SAA C-Tick CE Rohs
Specifications:
Features
1. Meanwell driver + Lumileds SMD3030 chips + Unique design / Private tooling heat sink
2. Unique design led linear high bay shape, lighter and smaller, no reflector, saving much freight cost
3. Compact Design, no assembly, easy installation, saving local labour cost
4. Modular design, easily replace the driver
5. Wide aluminum plate design, heat dissipation fast and evenly
6. SMD LEDs are on Large diameter PCB, so the heating from each SMD can be conducted soon and fully, which guaranteed a low lumen decay and long life
7. All stainless screws prevent bad situation
Hook installation steps:
1. Cut off power before operation.
2. Knowing the inside diameter of the luminaires then Choose suitable hook for the luminaires.
3. Fix the hook before installation and make the it can bear over 3 times weight of the lamp
4. Connect the lamp with hook and make it is safe.
5. Connect the power wire:Brown,"L",connect to LIVE; Blue, "N",connect to NEUTRAL; Lime-green,connect to EARTH/GROUND
6. Light up the luminaires!
Bracket installation steps:
1. Cut off power before installation.
2. Measure the hole size on the holder,choose suitable screw.
3. Fix the screw at the place where luminaires will be installed and it should can bear over 3 times the weight of the luminaires
4. Screw up the screws at both sides of holder, then connect the hold hole with screws, tighten it up.
5. Connect the power wire:Brown,"L",connect to LIVE; Blue, "N",connect to NEUTRAL; Lime-green,connect to EARTH/GROUND
6. Light up the luminaires !
Attention
Lamp must be vertical suspension and the supporter should can bear at least 3 times weight of the lamp.
Application
1. factories, industrial production workshop, warehouse;
2. gym, stadiums, golf courses,
3. commercial establishments, overpasses, outdoor advertising board, landmarks;
4. stage, yard, garden, lawn, park, plaza;
5. supermarket, shopping mall, exhibition hall;
6. ships, airports, subways, gas station, the train station, highway toll station, dock
7. factory, office, meeting room, conference hall, storeroom, etc.
Packaging & Shipping
Packaging: carton for strong protection
Shipping : 3-5 for samples, 5-15 for all items, DHL UPS EMS others are available.
User Manual:
Installation must be on more than 30kg load ceiling
Switch off power of the mains supply or respectively of the connection lead before doing any works.
Assembly must not damage or destroy conducting paths.
Make sure that the product is mounted on a stable, even and tilt-fixed background.
The complete installation must be done by an electrical expert who is familiar with the valid directives.
Quaity Control:
Stability TEST: make sure 100% of the lamps be aging test at least 48hours
Lighting TEST: make sure 100% of the lamps be lighted before packing
Drop TEST: make sure every single light have been well protected by box
Contact
Peony Jin
Mobile:0086-180 0253 2737
Please feel free to send us your inquiry, We are at your service any time!
Product Description
1. Original Lumileds SMD3030 chips , LM80 TM21 certified, Up to140lm/W
2. Meanwell driver, 5 years warranty
3. Power: 50w/100w/150w/200w/240w/300w
4. Equiv. to: 250W/250W-400W/600W/700W/1000W
5. Various beam angles optional: 30°*70°/60°*90°/120°
6. Function: Zigbee dimmable, DALI dimmable, motion sensor, daylight sensor optional
7. Materials: Die cast Aluminum / Tempered glass (PC lens optional)
8. Installation method: Loop & Hook hanging / Wall mount / Surface mount / Rack mount
9. Ideal mounting height: 8-15 m
10. Certification: SAA C-Tick CE Rohs
Specifications:
Model | Power | CCT(K) | Beam angle | LED Q`TY | Driver Brand | Working Voltage |
Linear high bya 50W | 50W | 3000K/4000K/5000K | 30°*70° /60°*90°/120° | Lumileds SMD3030 56pcs | MeanWell | AC100-277V AC200-305V |
Linear high bya 100W | 100W | 3000K/4000K/5000K | 30°*70° /60°*90°/120° | Lumileds SMD3030 112pcs | MeanWell | AC100-277V AC200-305V |
Linear high bya 150W | 150W | 3000K/4000K/5000K | 30°*70° /60°*90°/120° | Lumileds SMD3030168pcs | MeanWell | AC100-277V AC200-305V |
Linear high bya 200W | 200W | 3000K/4000K/5000K | 30°*70° /60°*90°/120° | Lumileds SMD3030 224pcs | MeanWell | AC100-277V AC200-305V |
Linear high bya240W | 240W | 3000K/4000K/5000K | 30°*70° /60°*90°/120° | Lumileds SMD3030 280pcs | MeanWell | AC100-277V AC200-305V |
Features
1. Meanwell driver + Lumileds SMD3030 chips + Unique design / Private tooling heat sink
2. Unique design led linear high bay shape, lighter and smaller, no reflector, saving much freight cost
3. Compact Design, no assembly, easy installation, saving local labour cost
4. Modular design, easily replace the driver
5. Wide aluminum plate design, heat dissipation fast and evenly
6. SMD LEDs are on Large diameter PCB, so the heating from each SMD can be conducted soon and fully, which guaranteed a low lumen decay and long life
7. All stainless screws prevent bad situation
Hook installation steps:
1. Cut off power before operation.
2. Knowing the inside diameter of the luminaires then Choose suitable hook for the luminaires.
3. Fix the hook before installation and make the it can bear over 3 times weight of the lamp
4. Connect the lamp with hook and make it is safe.
5. Connect the power wire:Brown,"L",connect to LIVE; Blue, "N",connect to NEUTRAL; Lime-green,connect to EARTH/GROUND
6. Light up the luminaires!
Bracket installation steps:
1. Cut off power before installation.
2. Measure the hole size on the holder,choose suitable screw.
3. Fix the screw at the place where luminaires will be installed and it should can bear over 3 times the weight of the luminaires
4. Screw up the screws at both sides of holder, then connect the hold hole with screws, tighten it up.
5. Connect the power wire:Brown,"L",connect to LIVE; Blue, "N",connect to NEUTRAL; Lime-green,connect to EARTH/GROUND
6. Light up the luminaires !
Attention
Lamp must be vertical suspension and the supporter should can bear at least 3 times weight of the lamp.
Application
1. factories, industrial production workshop, warehouse;
2. gym, stadiums, golf courses,
3. commercial establishments, overpasses, outdoor advertising board, landmarks;
4. stage, yard, garden, lawn, park, plaza;
5. supermarket, shopping mall, exhibition hall;
6. ships, airports, subways, gas station, the train station, highway toll station, dock
7. factory, office, meeting room, conference hall, storeroom, etc.
Packaging & Shipping
Packaging: carton for strong protection
Shipping : 3-5 for samples, 5-15 for all items, DHL UPS EMS others are available.
User Manual:
Installation must be on more than 30kg load ceiling
Switch off power of the mains supply or respectively of the connection lead before doing any works.
Assembly must not damage or destroy conducting paths.
Make sure that the product is mounted on a stable, even and tilt-fixed background.
The complete installation must be done by an electrical expert who is familiar with the valid directives.
Quaity Control:
Stability TEST: make sure 100% of the lamps be aging test at least 48hours
Lighting TEST: make sure 100% of the lamps be lighted before packing
Drop TEST: make sure every single light have been well protected by box
Contact
Peony Jin
Mobile:0086-180 0253 2737
Please feel free to send us your inquiry, We are at your service any time!